For the cash flows in the previous problem, suppose the firm uses the NPV decision rule. At a required return of 9 percent, should the firm accept this project? What if the required return was 21 percent?
For the cash flows in the previous problem, suppose the firm uses the NPV decision rule. At a required return of 9 percent, should the firm accept this project? What if the required return was 21 percent?